Sign in Subscribe

Planning Board schedules hearing on new fire station design

DocumentCenter · Meeting of February 20, 2020

Avon Planning Board schedules March 5 public hearing on new fire station. The Avon board on February 20 reviewed detailed architectural plans presented by Jon Novak of Coneco Engineering, discussing stone wall design, parking layout, septic systems, and utility and infrastructure placement. The March 5 hearing at 7 p.m. will allow residents to comment on the proposed design.

In the full story:

  • The complete report — 130 words

Source: the DocumentCenter meeting of February 20, 2020, reported from the official video recording and transcript.

Keep reading with a 30-day free trial

Subscribe to Avon News to keep reading this post and get 30 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

Starting a trial requires a payment method. After 30 free days your subscription begins at the price shown at checkout and renews automatically until you cancel. You can cancel anytime from your account. Subscription terms

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Avon News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe